Baron Point Petroleum Civil and Petroleum Engineering & Channel Development Unit senior management along with its top-tier joint venture partners are a multidisciplinary collection of companies that maintain resumes filled with landmark achievements on projects with no Lost Time Incident (“LTI”). Our streamlined enterprise and family of companies can provide for you, from design to maintenance, source to end use:

  • Comprehensive solutions for cross-country transport and distribution of oil, gas, water, electricity, heating and cooling, industrial services and products
  • Pipeline installation by Horizontal Directional Drilling (“HDD”) techniques across water bodies, roads, and railway crossings
  • Storage Tank Farm Facilities, Terminals, and Tankage
  • Petroleum, Oils and Lubricants (POL) Depots
  • Liquid petroleum gas (LPG) Bulk Terminals
  • Mechanical, Piping & Equipment, and Fire Fighting Facilities along with Civil, Electrical & Instrumentation Solutions
  • Civil & Structural works such as bridges, workforce housing and community development, general buildings, warehouses, and structures system provided by Joint-Venture Partner and BIM expert, Yasui Architects & Engineers, Inc., promoting multiple gas station deployments, food and beverage outlets, architecture, civil engineering, and urban development.

Important certifications include

Image module
Image module
Image module
Image module

Deep Fuel Storage Capabilities

Our family of companies offer comprehensive specialist services in fuel storage, both liquids and gases, as a turnkey contractor for complete facilities for both and for various types of individual pieces of equipment, and with civil engineering solutions such as workforce and staff residencies and communities.

  • Design and construction of vertical and spherical storage tanks
  • Design and construction of liquefied natural gas (LNG) tanks
  • Design and construction as EPC contractor of hydrocarbon pipeline and fuel storage plants
  • Access to Operation and Maintenance services for refineries and storage plants

Our family of companies have over 50 years’ continuous experience with National Oil Companies, State-Owned Enterprises and with some of the largest Fortune 500 companies in the world on mega-projects assignments such as:

  • Tankage works for EURO-IV project
    • CFR Tank – 34m DIA x 20 M Height – 2 Nos.
    • Dome Roof Tank – 22m Dia x 9.5 M Height – 2 Nos.
    • Dome Roof Tank – 22m Dia x 9.5 M Height – 2 Nos.
  • Providing sand pad foundation, design, fabrication, erection, welding, testing, calibrating, painting and commissioning of mild steel vertical oil/water storage tanks along with miscellaneous works on existing tanks:
    • 16.0 M Dia.x 13.0 Ht. IFR Tank – MS – 1 No.
    • 22.0 M Dia x 14.0 M Ht CR Tank – ATF – 2 Nos.
    • 20.0 M Dia x 14.0 M Ht CR Tank – SKO – 2 Nos.
    • 14.0 M Dia x 15.0 M Ht CR Tank – SKO – 1 No. >
    • 26.0 M Dia x 14.5 M Ht CR Tank – FO – 2 Nos
    • 24.0 M Dia x 14.0 M Ht CR Tank – FO – 2 Nos.
    • 16.0 M Dia x 13.0 M Ht CR Tank – HF HSD – 3 Nos
    • 24.0 M Dia x 17.0 M Ht CR Tank – Water – 2 Nos.
  • Fabrication and erection of above ground petroleum storage tanks
    • Cone Roof Tank – 24.3m dia x 12.0m Ht – 1 No.
    • Cone Roof Tank – 47.0m dia x 18.0m Ht – 4 Nos.
    • External Floating Roof Tank – 38.0m dia x 18.0m Ht – 2 Nos.
  • Fabrication, erection, welding, testing of CR & EFR Tanks at major pipeline terminal
    • Cone Roof Tank – 33m dia x 18m ht – HSD – 3 Nos.
    • Cone Roof Tank – 14m dia x 14.5m ht – SKO – 2 Nos.
    • Cone Roof Tank – 9m dia x 7.5 m ht – SLOP – 2 Nos.
    • External Floating Roof Tank – 33m dia x 17.25 m ht – MS – 3 Nos.
Image module

Pipeline & Facilities

Our team has succeeded on multiple landmark achievements shoulder-to-shoulder with our Joint-Venture Partners. We are known for a superior problem solving mentality, extensive educational possibilities for staff, state-of-the-art equipment and materials and the capacity to adapt to the unique needs of local projects.

  • World-level expertise in oil, gas, water, electricity, heating and cooling, industrial services and products delivery systems
  • 50 years’ continuous experience as an innovator in pipeline construction and the construction and maintenance of installations such as compressor and pumping stations
  • Safety and quality are our top priorities, and the team assigned to your project has the certificates and the references to prove it
  • Together with our family of companies, we carry out turnkey projects from design to commissioning. We also can help you maintain it!

Our family of companies has over 50 years’ continuous experience with National Oil Companies, State-Owned Enterprises and with some of the largest Fortune 500 companies in the world on mega-projects assignments such as:

  • The construction of a concrete tunnel with two steel gas pipelines under a river. The concrete tunnel has an outside diameter of ø3,000mm and an inside diameter of ø2,400mm. Two high-pressure gas pipelines of ø750mm each, are inserted into the tunnel.
  • Construction of 21 kilometers of ø20” and ø24″ ductile iron water transport pipeline. In total, eight auger drillings and thirteen Horizontal Directional Drilling. The longest single Horizontal Directional Drilling performed was 690 meters. Three of the thirteen Horizontal Directional Drillings were executed (with steel pipeline instead of ductile iron) several months before the execution of the rest of the project, which comprised only a cast iron pipeline.
  • The construction, internal and external coating and testing of two steel pipelines, ø24” and ø28” (each 3.5 kilometers in length) for water transport and the removal of two ø600mm asbestos cement pipelines with a total length seven kilometers. Also, the construction and installation of two valve stations.
  • 450 meters’ steel gas pipeline ø168,3 x 4,5; 400 meters’ ductile iron ø326mm; 450 meters’ steel pipeline ø813mm using trenchless technologies; Horizontal Directional Drilling 411 meters’ steel pipeline ø813; Horizontal Directional Drilling 414 meter PE casing ø800mm; and Horizontal Directional Drilling 414 meters’ pipeline ø168,3 x 5,6mm.
  • Construction and installation and commissioning of piping 32” for two oil stations, concrete structures and the E&I works. Additionally, the installation of 80 kilometers of FOC tubing and cable and installation and commission of 80km cathodic protection for a 32” pipeline.
Image module

Directional Drilling

If your Horizontal Directional Drilling assignment is happening, now, there is nothing in the world like what we can offer you in the full spread of 150, 250, and 450 ton rigs for your Horizontal Directional Drilling development.

Horizontal Directional Drilling is about bore positioning within a reservoir and crossing rivers, roads, and railways. From the design stage to the field execution of a final drilling plan, our team provides you the right set of equipment, software, labor and operational expertise to keep your Horizontal Directional Drilling project on-track, on-time and on-budget. We employ highly skilled engineers, field personnel and experienced Horizontal Directional Drilling teams which strive to:

  • Optimize your drilling operations
  • Provide you with outstanding services
  • Increase your productivity
  • Eliminate your downtime
  • Adapt to your changing needs

Our family of companies has over 50 years’ continuous experience with National Oil Companies, State-Owned Enterprises and with some of the largest Fortune 500 companies in the world on mega-projects assignments such as:

  • 12″ NB (2.0 km) Gas Pipeline across a major river by Horizontal Directional Drilling and the associated works.
  • 24” & 6” (2,325 meters) pipeline installation across a major river by Horizontal Directional Drilling and the associated works.
  • 28” (250 to 750 meters) OD, 0.5” WT, API 5L Grade X-70 Installation of 28” OD pipeline across 45 River/Distributary/Channel/Canal/Nala/Roads including seven crossings. As well as a de-bottlenecking pipeline project by Horizontal Directional Drilling and associated works.
  • Installation of 28” (870 meters) OD Pipeline across Navigational Channel of port by Horizontal Directional Drilling and the associated works. As well as the construction of trestle, piping and associated works for crude oil pipeline from a new oil jetty to the tank farm.